- Home
- The company
The company
Demanding technical networks since 2007
HydroExpress delivers hydraulic, piping and technical plumbing installations for data centers, industrial sites and tertiary buildings, in France and internationally.
Data centers · Industry · TertiaryFrance · InternationalSince 2007
Our history
From industry to large-scale projects
A path built site after site, from non-welded piping to the networks of the largest building operations.
2007
Creation of HydroExpress
Marketing of turnkey non-welded metal piping network projects for industry, to major French or foreign players based in France.
France & export
Hydraulic power piping networks
HydroExpress has marketed hydraulic network projects in France and for export, including to Brazil, Africa, China, Romania, the Netherlands and Switzerland.
2015
In-house installation of water-mist systems
Approached by a major player in water-mist fire protection systems, HydroExpress installs water-mist sprinklers in-house on large projects: Maison de la Radio, Hyatt Étoile, Hyatt Le Martinez in Cannes, Hyatt Palais de la Méditerranée in Nice.
2016
Plumbing for large-scale projects
Expansion into plumbing network installation for large-scale projects: Hyatt Étoile, Disney Center Parcs Villages Natures, Prison de la Santé, Trinity tower.
Today
Data centers, industry and tertiary buildings
Teams mobilized for hydraulic installations, piping, technical plumbing and insulation, with Isoxal or PVC finishes for the latter expertise.
Mobilization capacity
Mobilize, anywhere, fast
A mobilization capacity recognized by major construction and water-mist fire protection players.
01
Size & complexity
A mobilization capacity equal to the largest and most complex projects, from building to industry.
02
Technical
Mastered installation processes, including on hydraulic power networks and high-pressure steel.
03
Geographic
HydroExpress has marketed hydraulic network projects in France and for export, including to Brazil, Africa, China, Romania, the Netherlands and Switzerland.
04
Response time
Site workers mobilized quickly and accommodated as close as possible to remote sites.
The best guarantee of executionSafety · Quality · Cost · Delivery time
Method
From analysis to delivery
A recognized mobilization capacity: in project size and complexity, technically, geographically and in response time.
- 01
Needs analysis
Surveys, drawings, operating and scheduling constraints.
- 02
Technical preparation
Selection of materials, joining technologies and phasing.
- 03
Procurement / prefabrication
Tubes, flanges, valves and fittings prepared before arriving on site.
- 04
Team mobilisation
Trained site workers, accommodated as close as possible to remote sites.
- 05
Installation
Laying of networks in coordination with the other lots.
- 06
Checks and tests
Inspections, pressure tests and traceability of the works.
- 07
Handover
Handover file and support through commissioning.
Priority sectors
Three demanding environments
HydroExpress now focuses its positioning on data centers and technical buildings, industrial sites and tertiary buildings.
- 01Data centers and technical buildings
- 02Industrial sites
- 03Tertiary buildings
- 04Hydraulic networks and piping
- 05Technical plumbing
- 06Insulation with Isoxal or PVC finishes

