
Boulevard Haussmann
Paris · Commercial buildings
The expertise
Since 2016, HydroExpress has been installing the plumbing networks of large-scale projects: hotels, public facilities, towers and residential complexes. Our teams install PLB piping, fit out sanitary facilities, and deliver technical rooms, booster sets and domestic hot water (ECS) production.
Your challenges
Keeping up the pace of major plumbing projects, in refurbishment and new build alike
Industrialising the installation of repetitive networks (hotels, towers, care homes)
Coordinating piping, sanitary facilities and technical rooms within a single lot
HydroExpress carries out welded and non-welded assemblies, according to the materials and project requirements.
Method
Surveys, drawings, operating and scheduling constraints.
Selection of materials, joining technologies and phasing.
Tubes, flanges, valves and fittings prepared before arriving on site.
Trained site workers, accommodated as close as possible to remote sites.
Laying of networks in coordination with the other lots.
Inspections, pressure tests and traceability of the works.
Handover file and support through commissioning.